Appeal court revives 13,700 euro claim over unbuilt Edensa flat
The Court of Appeal revived a buyer's 13,700 euro claim in the Edensa bankruptcy and remanded it: the developer's silence and asset disposal showed bad faith, and the replacement flat's timing does not defeat the claim.
Af Taxxa AI OyOffentliggjort 26. november 2026
Branche: På tværs af brancher
The Court of Appeal of LithuaniaTeismai has quashed the refusal to confirm part of a buyer's claim in the bankruptcy of the developer UAB „Edensa“
Teismai and sent the question back for fresh examination
Teismai. In its ruling of 26 November in case No e2-1169-407/2026, a panel of Giedrė Čėsnienė, Laima Ribokaitė and Vigintas Višinskis held that the developer was at fault for bad-faith avoidance of the main apartment-sale contract
Teismai, and that the first-instance court examined the case superficially
Teismai by giving priority to the formal termination of the preliminary contract in 2023
Teismai.
The creditor had signed a preliminary contract on 5 August 2021 for a 60.15 sq. m flat with underground parking at Gelvonų g. 1B in Vilnius for 129,300 euros, paying a 19,400 euro advance. After the developer failed to conclude the main contractTeismai, the buyer contracted a different flat at 143,000 euros on 31 March 2022, paying in full on 20 May 2022, and claimed the 13,700 euro difference as direct losses
Teismai alongside the advance and 3,000 euros in penalties. The undisputed 22,400 euros were confirmed in June 2026; on 5 October 2026 the Vilnius Regional Court refused the disputed 13,700 euros
Teismai, reasoning that termination alone does not prove bad faith, that the replacement predated the formal termination notice of 24 March 2023, and that the lawfulness of the termination is still contested in another pending case.
The panel restated the governing rules: pre-contractual relations fall under Articles 6.163 to 6.165 of the Civil Code, damages follow only an unjustified refusal by a party acting in bad faith and at fault, and the refusing party bears the burden of justifying itself. A preliminary contract for a home may be a consumer contract, and consumer protection is a public interest. Being sued by the construction supervisor VTPSI over the 2018 building permit, with an interim disposal ban from 24 November 2021 to 26 August 2022, was not itself unlawful — and that litigation ended in the company's favour in August 2022. But the professional developer never told the consumer-creditor about performance prospects during the dispute, breaching duties of cooperation and disclosure, and afterwards made no effort to register the factually existing 85 percent completion recorded on 29 September 2021. Instead it transferred the building to UAB „MM Group“ on 24 August 2022, which passed it to UAB „Elenesa“ a month later in a transaction later declared void from the outset. The developer never intended to conclude the main contractTeismai, so the March 2023 termination notice was a formality
Teismai and waiting would only have increased the buyer's losses as prices rose.
On damages, the panel pointed to the concrete method of Article 6.258(5) of the Civil Code: a party that terminates after breach and concludes a replacement transaction within a reasonable time may recover the price difference. Whether that method applies here is for the retrialTeismai, which must establish whether the replacement was a real notarised transaction, whether the flats are comparable in price terms — the original a new 60.15 sq. m flat in Šeškinė, the replacement a 50.56 sq. m flat with surface parking in Lazdynėliai of unclear construction year in a different value zone — and the causal link between the unlawful conduct and the losses.
Legal basis: Lietuvos Respublikos civilinio kodekso 6.163–6.165, 6.247, 6.249 ir 6.258 straipsniai and Lietuvos Respublikos civilinio proceso kodekso 326 straipsnio 1 dalies 4 punktas.
Buyers holding preliminary contracts with an insolvent developer should document the developer's avoidance and the replacement home's comparability, since courts test bad faith and causation, not formal termination dates.